Harry & Sal's Dog House
Harry & Sal's Dog House
A roof over the head of that four legged family friend is often neglected. Sun, rain, wind and snow can make their life uncomfortable. But here is a design for a simple A-Frame shelter which is easy to put together and could be adapted for all sizes of dogs.While the method of building this kennel is suitable for all sizes, the measurements given would be satisfactory only for a medium sized dog about 400 mm high.
If you wish to adjust the size to suit your dog, remember that the dog should not only be able to stand upright inside the hennel but should also be able to turn around before he/she curls up and lies down.
75 x 50mm, 6 pieces 1.2m* for two A-Frames (use durable timber) 75 x 25mm, Decking, or equivalents, 16 pieces 1.2m* (for flooring) Scandinavian Pine Cladding* in 1.2m lengths (22 lengths should be sufficient for overall height of wall/roof and the end walls). *Consult your TABMA merchant for suitable available materials and how these can be ordered. 4/125 x 9mm Galvanise cup head bolts, nuts, washers. 100/50 x 2.8mm Galvanised flat head nails. 75 x 75mm x 1.2m length of zincalume angle as ridge capping OR 12/12 x 3.2m Galvanised round head, metal thread, screws.
TOOLS YOU WILL NEED MATERIALS YOU WILL NEED TIMBER (For example only) HARDWARE
1.2m length of aluminium dampcourse.
Features of the Dog House
CUT A-FRAME PIECES
From the 1.2m lengths of 75 x 50mm timber, cut four A-Frame legs (A) to this pattern using the 60o/30o set square to mark the angles shown.
CUT FLOOR PLATE
From the remaining two lengths of 75 x 50mm pieces, cut two floor plates (B) to pattern below, using the 60o/30o set square to mark the angles shown.
CUT TWO GUSSET PLATES
From a piece of Scandinavian Pine or other flat sheet material cut two gusset plates (C) to the pattern below using the 60o/30o set square to mark the angles shown.
ASSEMBLE A-FRAMES
Using two of the legs (A) cut in (1), and a floor (B) as in (2) and gusset plates (C), assemble and fix components to make two A-Frames as in sketch below.
CUT FLOORING
From the flooring material cut two short boards for side pieces each 900mm long. Cut two boards approx. 950mm cut remaining floor boards to 1200mm length sufficient to cover the floor plate, allowing boards to be fixed closely together.
FIX FLOORING
(a) Select one of the assembled A-Frames an fix flooring square to floor as shown in plan diagram using two nails at each board - pre-drilling nail holes at end of board.
FIX FLOORING
(b) To the remaining A-Frame fix the floor boards to the floor plate as shown in diagram, similarly pre-drilling nail holes at end of boards.
CUT AND FIX SIDE CLADDING
(I) Cut lengths of cladding to 1200mm lengths. Commencing with top of (A) temporarily fix one board square to (A) legs allowing projection of approx. 100mm both front and back beyond A-Frame. Use two nails on each end of the cladding piece (Note: spacing at top between frames should be exactly the same as that at flooring level i.e. 900mm).Sarking of building paper/heavy polythene is suggested. Fix this to open side by stapling or light tacking with cut tacks or similar. Then permanently fix a top cladding piece to this covered side, using two nails each leg. To complete this sarked side, continue fixing cladding sufficient to cover exposed ends of floor plates (B).
Remove temporary top cladding piece and fix sarking to second side. Fix cladding to second side, as in (II) above.
(Note: Allow sarking to slightly sag between frames and extend well over the edges of the outer floor boards).
CUT AND FIX END CLADDING
Cut first piece of end cladding to shape given for gusset plate (Step 3). Then continue cutting cladding pieces as required in diagram (See Step 10).
FIX FRONT CLADDING
Fix at least two pieces of angle cut cladding to front of structure. This could be increased so as to reduce height of door, depending on size of dog.
FIX REAR CLADDING
Loosely fix shaped piece of selected sarking to outside end frame, so as to drape outside edges of flooring. Commencing with topmost piece, cut and nail fix sufficient cladding to cover exposed ends of decking floor. Allow clearance between end cladding and ground line of at least 50mm.
CUT OFF, SAND OR SMOOTH
Cut off, sand or smooth to common line the exposed ends of cladding, similarly round off and smooth projecting floor boards.
PRIME COAT DOG KENNEL
Apply recommended prime coat(s) of selected coating system to exposed timbers including under flooring.
CUT AND FIX RIDGE CAPPING
Cut 1200mm length of selected ridge capping. Fix to ridge using zinc plated, round head, self tapping metal thread screws in pre-drilled holes. Prime coat ridge capping.
COMPLETE PAINTING
Apply final coats of selected paint/stain finish and allow several days to thoroughly dry and all odours to evaporate before introducing dog to new residence.
1 comments:
They have done really useful information. I enjoyed to reading this post. zinc roof cladding
Post a Comment